Thursday, 8 November 2012

Feedback...

From my presentation, the feedback I received was well founded and beneficial for my future development and on-going education.

One tutor expressed that he would have preferred to have seen an architectural possibility through the use of having a pod station which had a direct connection to such structures as the myer centre or additional shopping centres which could benefit and have a changed retail experience due to the connection of a direct transport link.

While this suggestion was well received, and had been a concept I had thought about before, it wasn't really where I was intending this project to go, even though there is a possibility to it. This project was more interested in providing a sample of a metro station, which could be replicated and dotted around the city in a part of a full transport network. Therefore, the overall output of the project was fairly generic and able to be mass produced, however, I greatly understood the possibility of a retail link and do believe it to be a good idea and so took the idea on board for future examination.

The final criticism was due to the fact that this project could do with some added complexity. While I had tried to allow for services and additional structural elements, I myself do agree that more things could have been though of. However, due to time constraints I tried to get the most important things represented in my output and work hierarchically in terms of detail. I believe this project could have benefitted from a series of detailed sections or typical details of construction and is once again, a point which I will take with me into the future.

No comments:

Post a Comment